ecology
Route selection study: N17 Knock to Collooney
MKO provided all the required ecological and biodiversity services to inform an options selection process for upgrading over 60km of the N17 national route between Knock in county Mayo and Collooney in county Sligo. The project involved preparing an initial ecological constraints study followed by the ecological assessment of various potential route options. The assessments involved desk and field surveys and extensive collaboration with a multi-disciplinary design team. The ecological assessment that MKO undertook fed into a multi-criteria analysis that ultimately led to developing a single emerging preferred route corridor for the proposed road upgrade.